lineTEC novelty

lineTEC ProFlex S UV – The house connection liner for UV-LED curing

On 01.10.2021, lineTEC will launch the first liner specially developed for light curing. Compared to liners made of standard polyester fibres, this liner has up to 10 times higher light transmission. This enables a much faster and, above all, safer curing of light-reactive resins with tensile speeds > 1 m/min.

Light curing is becoming increasingly popular in the field of domestic sewer rehabilitation. While translucent glass liners are used for large nominal diameters, these can only be used to a very limited extent in small nominal diameters due to bends and dimensional changes. Flexible liners made of polymer fibres (e.g. polyester), such as the proven linTEC ProFlex, are used here.

To counter this problem, we had to develop a light-transmissive fibre that corresponds to a standard polyester fibre in terms of processing properties and elongation behaviour.

After two years of development, we are pleased to present ProFlex S UV, a felt liner made of the new PES UVx10 fibre. Compared to standard fibres, this fibre has up to 10 times the light transmission according to DIN EN 410 at wavelengths in the range of 250 nm to 600 nm. This means that light-curing resins can also cure much faster in the house connection and the risk of poor curing on the pipe wall due to self-shadowing fibres is significantly reduced. For further information, please visit www.lineTEC.info

lineTEC innovation

lineTEC Universal TY-Liner – the name says it all

Anyone who rehabilitates pipe inlets knows the problem. In order to be prepared for all conceivable connection situations, you would have to keep countless cap profiles and sleeves in stock.

Not so with the new lineTEC Universal TY-Liner.

lineTEC offer the TY-Liner in the variants Flex with 2-2.5 mm and ProFlex with 3-3.5 mm installation thickness. The new sleeve cut makes it possible to rehabilitate inlets between 45° and 90° with only one sleeve. At the same time, the main pipe is lined around the pipe with the Flex up to DN 150 and with the ProFlex up to DN 300.

The rim of the lineTEC Universal TY liner is particularly long. Similar to a short liner mat, it can be cut to the diameter of the main pipe so that the ends overlap after installation to close the pipe. If the brim is not cut to size, it provides a re-support in pipes up to DN 600 and prevents the often feared loosening and flushing away of the collar.

The spigot of the lineTEC Universal TY-Liner is positioned at an angle of 67°. Thanks to the flexible carrier material, the TY-Liner thus automatically adapts to connection angles between 45° and 90°. During production, the nozzle was deliberately not sewn to the sleeve. This makes it possible for the nozzle to adapt to the inlet angle without wrinkles. At the same time, this minimises the risk of wrinkles forming if the sleeve is not positioned exactly.

The lineTEC Universal TY liners can be cut to size as required and installed with the usual packers and setting devices. Thanks to their versatility, it is possible to master almost any rehabilitation situation with only 9 sleeves.

Corrected Business Adress

NOTE!
Please note that we have corrected our business address.
Correct it has to be:

Vereinigte Filzfabriken AG
Giengener Weg 66
89568 Hermaringen
Germany

The headquarters of the Vereinigte Filzfabriken AG is still located in Giengen according to its statutes. The plant is still located in the district of Gerschweiler,
which belongs to Hermaringen and not to Giengen.

» Plan your route with Google Maps
Google Plus Code: J772+72

(Info: 22.07.2020)

Corona Virus SARS-CoV-2
Information on the measures taken to prevent transmission

It is important to slow down the spread of the coronavirus SARS-CoV-2 as much as possible.
Vereinigte Filzfabriken AG and the FFF Group have drawn up an operational pandemic plan for all divisions and have taken extensive measures to prevent infection and spread. The aim is to interrupt the chains of infection and to keep personal contact among employees to a minimum.

PDF to download

(News: 01.04.2020)

lineTec-Einsatz im Tessiner Autobahntunnel

Von Oktober 2016 bis März 2017 sind im Galleria della Collina d‘Oro-Tunnel in der Schweiz auf einer
Länge von 600 m schadhafte Abwasserkanäle mit lineTec saniert worden. Weiterlesen

(Quelle: B_I Umweltbau, lineTec-Einsatz im Tessiner Autobahntunnel, 03.2017)

Corrected Business Adress

NOTE!
Please note that we have corrected our business address.
Correct it has to be:

Vereinigte Filzfabriken AG
Giengener Weg 66
89568 Hermaringen
Germany

The headquarters of the Vereinigte Filzfabriken AG is still located in Giengen according to its statutes. The plant is still located in the district of Gerschweiler,
which belongs to Hermaringen and not to Giengen.

» Plan your route with Google Maps
Google Plus Code: J772+72

(Info: 22.07.2020)

Corona Virus SARS-CoV-2
Information on the measures taken to prevent transmission

It is important to slow down the spread of the coronavirus SARS-CoV-2 as much as possible.
Vereinigte Filzfabriken AG and the FFF Group have drawn up an operational pandemic plan for all divisions and have taken extensive measures to prevent infection and spread. The aim is to interrupt the chains of infection and to keep personal contact among employees to a minimum.

PDF to download

(News: 01.04.2020)

lineTec-Einsatz im Tessiner Autobahntunnel

Von Oktober 2016 bis März 2017 sind im Galleria della Collina d‘Oro-Tunnel in der Schweiz auf einer
Länge von 600 m schadhafte Abwasserkanäle mit lineTec saniert worden. Weiterlesen

(Quelle: B_I Umweltbau, lineTec-Einsatz im Tessiner Autobahntunnel, 03.2017)

Corrected Business Adress

NOTE!
Please note that we have corrected our business address.
Correct it has to be:

Vereinigte Filzfabriken AG
Giengener Weg 66
89568 Hermaringen
Germany

The headquarters of the Vereinigte Filzfabriken AG is still located in Giengen according to its statutes. The plant is still located in the district of Gerschweiler,
which belongs to Hermaringen and not to Giengen.

» Plan your route with Google Maps
Google Plus Code: J772+72

(Info: 22.07.2020)

Corona Virus SARS-CoV-2
Information on the measures taken to prevent transmission

It is important to slow down the spread of the coronavirus SARS-CoV-2 as much as possible.
Vereinigte Filzfabriken AG and the FFF Group have drawn up an operational pandemic plan for all divisions and have taken extensive measures to prevent infection and spread. The aim is to interrupt the chains of infection and to keep personal contact among employees to a minimum.

PDF to download

(News: 01.04.2020)

lineTec-Einsatz im Tessiner Autobahntunnel

Von Oktober 2016 bis März 2017 sind im Galleria della Collina d‘Oro-Tunnel in der Schweiz auf einer
Länge von 600 m schadhafte Abwasserkanäle mit lineTec saniert worden. Weiterlesen

(Quelle: B_I Umweltbau, lineTec-Einsatz im Tessiner Autobahntunnel, 03.2017)

Corrected Business Adress

NOTE!
Please note that we have corrected our business address.
Correct it has to be:

Vereinigte Filzfabriken AG
Giengener Weg 66
89568 Hermaringen
Germany

The headquarters of the Vereinigte Filzfabriken AG is still located in Giengen according to its statutes. The plant is still located in the district of Gerschweiler,
which belongs to Hermaringen and not to Giengen.

» Plan your route with Google Maps
Google Plus Code: J772+72

(Info: 22.07.2020)

Corona Virus SARS-CoV-2
Information on the measures taken to prevent transmission

It is important to slow down the spread of the coronavirus SARS-CoV-2 as much as possible.
Vereinigte Filzfabriken AG and the FFF Group have drawn up an operational pandemic plan for all divisions and have taken extensive measures to prevent infection and spread. The aim is to interrupt the chains of infection and to keep personal contact among employees to a minimum.

PDF to download

(News: 01.04.2020)

lineTec-Einsatz im Tessiner Autobahntunnel

Von Oktober 2016 bis März 2017 sind im Galleria della Collina d‘Oro-Tunnel in der Schweiz auf einer
Länge von 600 m schadhafte Abwasserkanäle mit lineTec saniert worden. Weiterlesen

(Quelle: B_I Umweltbau, lineTec-Einsatz im Tessiner Autobahntunnel, 03.2017)

lineTEC novelty

lineTEC ProFlex S UV – The house connection liner for UV-LED curing

On 01.10.2021, lineTEC will launch the first liner specially developed for light curing. Compared to liners made of standard polyester fibres, this liner has up to 10 times higher light transmission. This enables a much faster and, above all, safer curing of light-reactive resins with tensile speeds > 1 m/min.

Light curing is becoming increasingly popular in the field of domestic sewer rehabilitation. While translucent glass liners are used for large nominal diameters, these can only be used to a very limited extent in small nominal diameters due to bends and dimensional changes. Flexible liners made of polymer fibres (e.g. polyester), such as the proven linTEC ProFlex, are used here.

To counter this problem, we had to develop a light-transmissive fibre that corresponds to a standard polyester fibre in terms of processing properties and elongation behaviour.

After two years of development, we are pleased to present ProFlex S UV, a felt liner made of the new PES UVx10 fibre. Compared to standard fibres, this fibre has up to 10 times the light transmission according to DIN EN 410 at wavelengths in the range of 250 nm to 600 nm. This means that light-curing resins can also cure much faster in the house connection and the risk of poor curing on the pipe wall due to self-shadowing fibres is significantly reduced. For further information, please visit www.lineTEC.info

lineTEC innovation

lineTEC Universal TY-Liner – the name says it all

Anyone who rehabilitates pipe inlets knows the problem. In order to be prepared for all conceivable connection situations, you would have to keep countless cap profiles and sleeves in stock.

Not so with the new lineTEC Universal TY-Liner.

lineTEC offer the TY-Liner in the variants Flex with 2-2.5 mm and ProFlex with 3-3.5 mm installation thickness. The new sleeve cut makes it possible to rehabilitate inlets between 45° and 90° with only one sleeve. At the same time, the main pipe is lined around the pipe with the Flex up to DN 150 and with the ProFlex up to DN 300.

The rim of the lineTEC Universal TY liner is particularly long. Similar to a short liner mat, it can be cut to the diameter of the main pipe so that the ends overlap after installation to close the pipe. If the brim is not cut to size, it provides a re-support in pipes up to DN 600 and prevents the often feared loosening and flushing away of the collar.

The spigot of the lineTEC Universal TY-Liner is positioned at an angle of 67°. Thanks to the flexible carrier material, the TY-Liner thus automatically adapts to connection angles between 45° and 90°. During production, the nozzle was deliberately not sewn to the sleeve. This makes it possible for the nozzle to adapt to the inlet angle without wrinkles. At the same time, this minimises the risk of wrinkles forming if the sleeve is not positioned exactly.

The lineTEC Universal TY liners can be cut to size as required and installed with the usual packers and setting devices. Thanks to their versatility, it is possible to master almost any rehabilitation situation with only 9 sleeves.

Corrected Business Adress

NOTE!
Please note that we have corrected our business address.
Correct it has to be:

Vereinigte Filzfabriken AG
Giengener Weg 66
89568 Hermaringen
Germany

The headquarters of the Vereinigte Filzfabriken AG is still located in Giengen according to its statutes. The plant is still located in the district of Gerschweiler,
which belongs to Hermaringen and not to Giengen.

» Plan your route with Google Maps
Google Plus Code: J772+72

(Info: 22.07.2020)

Corona Virus SARS-CoV-2
Information on the measures taken to prevent transmission

It is important to slow down the spread of the coronavirus SARS-CoV-2 as much as possible.
Vereinigte Filzfabriken AG and the FFF Group have drawn up an operational pandemic plan for all divisions and have taken extensive measures to prevent infection and spread. The aim is to interrupt the chains of infection and to keep personal contact among employees to a minimum.

PDF to download

(News: 01.04.2020)

lineTec-Einsatz im Tessiner Autobahntunnel

Von Oktober 2016 bis März 2017 sind im Galleria della Collina d‘Oro-Tunnel in der Schweiz auf einer
Länge von 600 m schadhafte Abwasserkanäle mit lineTec saniert worden. Weiterlesen

(Quelle: B_I Umweltbau, lineTec-Einsatz im Tessiner Autobahntunnel, 03.2017)

Corrected Business Adress

NOTE!
Please note that we have corrected our business address.
Correct it has to be:

Vereinigte Filzfabriken AG
Giengener Weg 66
89568 Hermaringen
Germany

The headquarters of the Vereinigte Filzfabriken AG is still located in Giengen according to its statutes. The plant is still located in the district of Gerschweiler,
which belongs to Hermaringen and not to Giengen.

» Plan your route with Google Maps
Google Plus Code: J772+72

(Info: 22.07.2020)

Corona Virus SARS-CoV-2
Information on the measures taken to prevent transmission

It is important to slow down the spread of the coronavirus SARS-CoV-2 as much as possible.
Vereinigte Filzfabriken AG and the FFF Group have drawn up an operational pandemic plan for all divisions and have taken extensive measures to prevent infection and spread. The aim is to interrupt the chains of infection and to keep personal contact among employees to a minimum.

PDF to download

(News: 01.04.2020)

lineTec-Einsatz im Tessiner Autobahntunnel

Von Oktober 2016 bis März 2017 sind im Galleria della Collina d‘Oro-Tunnel in der Schweiz auf einer
Länge von 600 m schadhafte Abwasserkanäle mit lineTec saniert worden. Weiterlesen

(Quelle: B_I Umweltbau, lineTec-Einsatz im Tessiner Autobahntunnel, 03.2017)

Corrected Business Adress

NOTE!
Please note that we have corrected our business address.
Correct it has to be:

Vereinigte Filzfabriken AG
Giengener Weg 66
89568 Hermaringen
Germany

The headquarters of the Vereinigte Filzfabriken AG is still located in Giengen according to its statutes. The plant is still located in the district of Gerschweiler,
which belongs to Hermaringen and not to Giengen.

» Plan your route with Google Maps
Google Plus Code: J772+72

(Info: 22.07.2020)

Corona Virus SARS-CoV-2
Information on the measures taken to prevent transmission

It is important to slow down the spread of the coronavirus SARS-CoV-2 as much as possible.
Vereinigte Filzfabriken AG and the FFF Group have drawn up an operational pandemic plan for all divisions and have taken extensive measures to prevent infection and spread. The aim is to interrupt the chains of infection and to keep personal contact among employees to a minimum.

PDF to download

(News: 01.04.2020)

lineTec-Einsatz im Tessiner Autobahntunnel

Von Oktober 2016 bis März 2017 sind im Galleria della Collina d‘Oro-Tunnel in der Schweiz auf einer
Länge von 600 m schadhafte Abwasserkanäle mit lineTec saniert worden. Weiterlesen

(Quelle: B_I Umweltbau, lineTec-Einsatz im Tessiner Autobahntunnel, 03.2017)

Corrected Business Adress

NOTE!
Please note that we have corrected our business address.
Correct it has to be:

Vereinigte Filzfabriken AG
Giengener Weg 66
89568 Hermaringen
Germany

The headquarters of the Vereinigte Filzfabriken AG is still located in Giengen according to its statutes. The plant is still located in the district of Gerschweiler,
which belongs to Hermaringen and not to Giengen.

» Plan your route with Google Maps
Google Plus Code: J772+72

(Info: 22.07.2020)

Corona Virus SARS-CoV-2
Information on the measures taken to prevent transmission

It is important to slow down the spread of the coronavirus SARS-CoV-2 as much as possible.
Vereinigte Filzfabriken AG and the FFF Group have drawn up an operational pandemic plan for all divisions and have taken extensive measures to prevent infection and spread. The aim is to interrupt the chains of infection and to keep personal contact among employees to a minimum.

PDF to download

(News: 01.04.2020)

lineTec-Einsatz im Tessiner Autobahntunnel

Von Oktober 2016 bis März 2017 sind im Galleria della Collina d‘Oro-Tunnel in der Schweiz auf einer
Länge von 600 m schadhafte Abwasserkanäle mit lineTec saniert worden. Weiterlesen

(Quelle: B_I Umweltbau, lineTec-Einsatz im Tessiner Autobahntunnel, 03.2017)